Winter Camp Future Society / Skunkworks / The Attic
The Attic
| Project Manager: | Paul Kupser |
| Start Date: | 1998-12-31 |
| Target Date: | 2015-12-26 |
| Status: | Complete |
- Description
- At Winter Camp XXII, the campers arrived to find the cabin had been seriously remodeled and the attic was more accessible from a high door in the dining area; we used a bunk bed to reach it.</p><P>We have since made many improvements to the safety, efficiency, and security of our storage.
- Goals in progress
- No In Progress goals exist for this project
- Goals Achieved
- Create a way to allow safe retrieval of our gear. (Complete)
- Improve the quality of storage and the safety of those moving in the attic by installing flooring. (Complete)
- Reduce the volume of gear which must be transported to and from camp each year. (Complete)
- Secure our property against theft, damage, and misuse. (Complete)
- Tasks Completed
Task Assignee Assigned Target Complete Install floor boards in attic Paul Kupser 2012-12-27 2012-12-27 2012-12-27 Create a locking mechanism for the door and lock our items between camps. Doug Wilson 2013-09-01 2013-09-01 2013-09-01 Build a ladder for access to the attic. Doug Wilson 2014-12-31 2015-12-26 2015-12-26 - Tasks In progress
No tasks have been completed