Winter Camp Logo

Winter Camp Universe
Zamboni Construction Risk Mitigation Worksheet

Older than some campers' parents.

Another Member of the Winter Camp Network:

Universal Measurement System

Anyonce can measure in minutes, learn about Jiffys.

Winter Camp Future Society / Planning / Zamboni Construction Risk Mitigation Worksheet

Zamboni Construction Risk Mitigation Worksheet

Section Menu

Activity Tools
Meal Tools
Theme Tools
Scheduling Tools

Description:We construct a machine to smooth the ice.
Program:Scouts BSA, Order of the Arrow
Adjusted Hazard:IIIE (Improbable, Marginal)
Mitigation Decision:Acceptable with Review
Prepared:2023-12-01 by sdonohue


Hazard Cause / EffectCorrective Actions
Hazard DescriptionCauseEffectInitial Risk RatingPossible Controlling MeasureClosing CommentsStatusFinal Risk

Historical Context: We have not yet held this event, but will use our standard safety protocols and mitigations to make it as safe as possible.

Based on Location: O Timing: D Category: Ill-Conceived

Return to the Zamboni Construction details.


There is additional functionality on this page if you are logged into the site.